AJ Tyler Operations

UPGRADES & MODIFICATIONS

The vehicle maintenance and service garage built in the early Seventies needed to be structurally modified to accommodate twenty-three feet wide doors, removing columns and replacing beams. Thermal resistance was increased using thermal doors, brickwork was peeled away from its uninsulated block cavity and replaced with four-inch prefinished insulated wall panels.

Building Size: 6,650sf
Project Method: Lump Sum
Schedule: July 2014 – September 2015