801 Dundas Street, Woodstock project
Originally being built as a speculative development with three tenant occupancy, this is a very versatile project in a modest footprint. The new build consists of a structural steel frame and multiple facade materials including storefront glazing, masonry and exterior insulation finishing system (EIFS), which provided exterior walls with insulated finished surface and water-proofing.
801 Sarnia Road project
This exciting 5 storey 72 unit apartment building project is set to break ground Fall 2021 with michael + clark construction as the Construction Management company of choice! We have played a key role in the Pre-Construction & Planning phases to set the project up for a successful Construction phase. Our team has established the […]
Amino project
The manufacturing capacity of Amino was increased with a new thirty ton press pit, and an addition to the existing plant. The existing building foundation was underpinned to accommodate the expansion and construction of the press pit, and the transfer. It now features a high bay section in order to accommodate the thirty-five ton overhead […]
BOS Innovations project
Innovation Park is home to the new 50,000 sq ft. facility of BOS Innovations with their new high tech industrial build, where we have been involved on a Construction Management basis, including during the design phase and with mechanical and electrical integration. This facility which will house their head office, engineering and manufacturing, consists of […]
BOS Innovations @ The Collider project
In this exciting project onsite at Western Research Park, michael + clark construction was selected as the Construction Manager for the execution of this R&D Facility located within the Collider Building. This involved an aggressive construction schedule during a pandemic, to ensure the 2,400 sq.ft. high tech lab and office construction was done on-time and […]
CanUsa project
Throughout the design of this project there were a number of factors that required careful balance and management from beginning to completion. Some of the challenges of this project included strict environmental controls due to local ecological factors, and the maintenance of client operations manufacturing and shipping in excess of two hundred truck movements a […]
CARFAX project
This updated modern office structure is an excellent example of what can be achieved with repurposed space. The project includes the completion of fifty-thousand square feet of office commercial space built over two floors on the second and third floors of the former Kellogg Factory in London, Ontario. The final design has maintained much of […]
Carling Heights Optimist Community Centre project
This 75,000 sq.ft building required us to upgrade the perimeter of the entire building while being fully operational and open to the public for use. We ensured that there was a very detailed and diligent risk management approach followed at all times, in order to maintain safety for the public with the close proximity work […]
Read moreabout the Carling Heights Optimist Community Centre project
Cole-Munro project
This particular project involved designing the fish processing facility with future expansion in mind, which would duplicate the size of this building. Some project details from this build include a one hundred and twenty-five thousand foot clear span pre-engineered structure in the production area with full wash down capabilities, ambient design, and cooler and freezer […]
Covenant Christian School project
The scope of work on the Covenant Christian School included the construction of a steel and load-bearing masonry addition consisting of pre-engineered metal, as well as the construction of a gymnasium, commons, washroom, servery and support spaces. Additionally, interior renovations were carried out to create new washrooms in the existing building.
Dr. Oetker project
Working in a fully operational high-capacity food production facility comes with several challenges. The project had to be broken into several phases to minimize disruption to the facility’s day to day activities. Initial phases included the installation of additional air handling, lighting and sprinkler upgrades, epoxy coatings, and sanitation upgrades to equipment wash down rooms […]
Dutch Brothers Concrete project
We proudly completed this fast tracked project in a whirlwind four and a half months, which is about half the time it would have taken under a conventional construction schedule! This design build project consists of a four storey production plant including a two story office space, spread over approximately 4,625 sq.ft. and an overall […]
Frulact Canada project
Building on three sides of a busy, fully-operational food processing facility, this forty-three thousand six hundred square foot expansion nearly doubles the size of the existing operation. The areas of expansion include freezers, cooler, dry storage, CIP and final product. Additional shipping and product receiving together with packaging are also enlarged. In a multi-phased approach, […]
Goodwill project
This commercial project entailed a three phase renovation and addition to the existing store while remaining operational. Phase one was the strip-out and fit-out, including structural reinforcing, new dock addition and re-roofing, of nine and a half thousand square foot CRU. Goodwill was then relocated into the new space and phase two– the renovation and […]
Home Hardware project
This new greenfield development project entailed a base-build and tenant fit-out, which made the commercial tenant interior space suitable for occupation. The building incorporates a retail sales floor, drive through lumber storage and pick up area, garden centre, administrative offices, and multiple staff areas.
Kilworth Medical project
Coming soon to the area, this 2-storey medical building consisting of 17,000 sq.ft. of space will house the future Kilworth Medical Centre! We are looking forward to partnering as the Construction Managers on this exciting new build project, which will involve constructing the shell structure and building envelope of the facility, along with common area, […]
Logistics Hub project
This project involved the relocation of major site infrastructure, including an existing rail line, the fire loop servicing the property, and the main sanitary sewer. Additionally, relocation of key infrastructure and the construction of a new fire pump house and services to split incoming city service into two to feed the existing facilities. An addition […]
London Children’s Museum project
The “New Home of The London Regional Children’s Museum” will be located on the fourth floor of 100 Kellogg Lane, London, Ontario. The work on-site will consist of fixtures and fittings, floor, wall and ceiling finishes; mechanical, electrical and life safety provision; partition construction and structural adaptation or modifications as required. An integral aspect of […]
Middlesex London Health Unit project
This project included a multi-phased, condensed construction schedule of an interior tenant fit-up, which was able to accommodate operational dates and the coordination of furniture installation from the former location. The scope of work involved a large-scale, multi-story interior renovation of the cafeteria, offices, labs, washrooms, consultation rooms and dental offices. Structural openings were formed […]
Mr. Lube project
These projects were located in London, Barrie and Orilla, with all facilities being new build pad stores, consisting of three bay services centres built over a full basement plus sub basements. Each store was approximately twenty four hundred square feet in footprint and was fully finished ready for service operations to commence including all equipment. […]
My Health project
As the contractor of choice for My Health, we worked closely on a design-build basis on their first major fit-up and continued to fit-up and renovate four additional clinics across Ontario is London, Arva, Toronto, and Sudbury, each with approx. 1600 sq ft interiors. These projects are all completed in existing occupied buildings and construction […]
Nixon Medical Centre project
Purpose built and complex, this three-storey, twenty-one thousand five hundred square foot building is host to a variety of medical services. The building fit-up included complete coordination and construction of clinical and minor procedure areas, a walk-in clinic, radiology and physiotherapy departments, a blood lab, and a pharmacy. Complex mechanical systems provide maximum control and […]
Piller’s Fine Foods project
We partnered with Piller’s Fine Foods to complete an expansion to their fully operational meat processing plant in Brantford, Ontario. This new addition will provide an extra 27,000 sq.ft of building footprint, which is almost a forty percent increase to their building size and will house their drying rooms, packaging lines, pack-off, dry storage, warehousing […]
Poly-Nova Technologies project
As Construction Managers for this multi-phased industrial project, tasked with keeping the plant fully functional at all times, including the use of the shipping and receiving areas, we were excited for the challenge! Involving a process addition to automate and expand the existing production lines with welded stainless steel pipework, multi-level structures and a platform, […]
Popeye’s Restaurant project
We were commissioned to build a new shell construction for this Chatham location in alignment with Popeye’s Corporate Brand Standards. Our team proudly delivered this Structure for Success on schedule and on budget
Roundhouse project
The finished result of this project is a compelling downtown location with historic and contemporary modern designs. The structure’s original 1800s segmented locomotive storage and maintenance building were extended in a counter-clockwise direction, while the use of composite panels, hi-tech glazing and lighting systems replaced the original traditional wood and masonry construction techniques. The second […]
Shogun Maitake project
This project was centred around a specialized facility designed for the growth and production of maitake mushrooms, a type of gourmet mushroom found in specialty grocers and used heavily in cancer treatment research. The schedule for this project was an aggressive fast-track in order to meet the owner’s requirements. To achieve the client’s goal, michael […]
Spark Power project
This rapidly growing power company made the decision to relocate from Tillsonburg to London, as they required larger indoor storage space with closer proximity to the 401 corridor. Our team was chosen to complete the demolition of the interior of an existing facility and renovate the office and warehouse space, as it was important to […]
Starlim project
The scope of this project involved maintaining the client’s ability to remain fully operational during the expansion operations, while balancing upgrading infrastructure and phasing. This expansion project included eighty-six hundred square feet of new office administration space over two floors, and the subsequent reconfiguration of fifty-seven hundred square feet of the current office and staff […]
Tepperman’s project
This commercial construction project was undertaken in seven phases to accommodate the client’s ability to remain operational throughout the process. Renovated areas included the interior, and exterior of an existing furniture and appliance retail store, as well as the addition of a covered vehicle pick up area.
Weathertech project
In December of 2014, a fire completely destroyed the previous facility and displaced all thirty employees to temporary accommodations until reconstruction was finished. The reconstruction consisted of the following three main components: finished office space, shop area, and a twenty-two thousand five hundred square foot pre-engineered clear span warehouse and storage building structure. The scope […]
WeedMD project
This project has required extensive and flexible planning in order to undertake construction in multiple phases and locations on the complex in order to ensure the client’s business remains uninterrupted. The cannabis industry is in a pioneering phase in Canada and our overall construction plan is constantly pivoting and evolving while working to maintain coordination […]
Wellington – Southdale Plaza project
This project features the redevelopment of a three-acre brownfield site at the intersection of two main arterial roads. The project is phased to keep all tenants of the current Florida-mall-style layout of four buildings, operational. The project will transform the current thirty-one thousand five hundred square foot configuration, into a more modern power-centre configuration of […]
Western Fair project
We are excited to embark on this multi-phase retrofit of the former Progress Building at Western Fair, which will accommodate ‘The Grove’, London’s newest Agri-food incubator space. This project will involve multi-tenant fit-ups, consisting of intensive and sophisticated mechanical and electrical systems and upgrades to the facilities, while ensuring construction meets all food grade requirements, […]
Youth Opportunities Unlimited project
We have been a long time supporter of the Youth Opportunities Unlimited charity and have dedicated countless hours of service and labour over the years to their worthy cause. Having worked very closely as a professional representative and giving YOU valuable advice in their upcoming 6 storey mixed use residential and health services building project, […]